6″ IC Fabrication Facility Expansion

OWNER
Hewlett-Packard, Components Group

ARCHITECT
CAS Architects, Inc., Mountain View,


PROJECT LOCATION
San Jose, CA

ENGINEER
Greene Engineers, Campbell, CA

TYPE OF CONTRACT
Guaranteed Maximum; Design/ Build

SCHEDULE
Fast-Tracked

PROJECT DESCRIPTION
We were selected as a team member in a strategic alliance to design and build an 8,400 sq ft. clean room fabrication facility and upgrade the plant chemical delivery system. The fabrication area remained in operation throughout the construction periods. Temporary walls were constructed to retain the temperature, relative humidity, plus a Class 100 rating in the existing areas.